Skip to content
JHON CAMPOSProject Manager
Project Manager · Mining project controls

Slippage shows up before it happens

I am Jhon Campos Aguirre, with a Master in Project Management from ESAN and licensed as an Industrial and Mining Engineer (CIP 258814). I manage mining projects from the controls side: today, at PEVOEX's corporate office, I run budgeting, bidding and project controls across all of its projects. Over more than eight years at Buenaventura, Besalco-Stracon, Minsur, Chinalco, Volcan and Boroo I built the full controls system (schedule in Primavera P6, cost and progress under EVM, NEC 3 contracts and Power BI dashboards) and led teams of 45 people across Peru and India.

Trujillo, Peru Available worldwide, remote Contract and project work
If you are assessing my profile

Career and education

More than eight years of planning and project controls inside mining operations, two engineering degrees, a Master in Project Management from ESAN and corporate budget and bidding management.

See career
If you need something solved

From the bid to project close-out

Budgets and tender bids, planning and progress schedules, cost and progress control, contractual time substantiation and dashboards for management. Full project or one-off engagement.

What I cover
BudgetsTendersP6 schedulesEVM and forecastNEC 3 and claimsPower BI
See services

Managing projects and contractors in demanding environments

  • PEVOEX
  • Buenaventura
  • Besalco
  • Stracon
  • Minsur
  • Chinalco
  • Volcan
  • Boroo
  • ANIN
What management receives

The artefacts I work with

Project control is not demonstrated with adjectives. These are the artefacts I produce every week and, above all, the decision each one enables.

PERIOD 1 COMPLETION

S-curve: plan against actual

Planned and executed cumulative progress on one axis, with the gap visible at every data date and the forecast to completion.

Decision: do we accelerate, re-plan, or accept the delay?
EARTHWORKSCIVIL WORKS ERECTIONCLOSE-OUT DATA DATE

Schedule with critical path

Primavera P6 structure with WBS, logic, resources and version control. The critical path in blue; everything else has float and can wait.

Decision: where do we put the extra crew so it actually counts?
TARGET 90% WEEK 1 WEEK 14

PPC and constraints

Weekly plan compliance under Last Planner, with the four-week Look Ahead and the constraints blocking what was committed.

Decision: which constraint must be cleared this week, and by whom?

Sample visualisations using illustrative data. Each project's dashboards are built on its own information and under the applicable confidentiality agreements.

Selected work

A few concrete engagements

Outside full-time roles, these give an idea of the kind of problem I tend to solve.

SUNASS · Public sector

Regulatory Benchmarking of Water Utilities

Interactive Power BI dashboard for Peru's National Water and Sanitation Regulator, publishing the regulatory benchmarking results of the country's water and sanitation utilities. It is hosted on the Peruvian Government platform and openly accessible on gob.pe.

Power BIData modellingDAXPublic sector
Open the dashboard
Besalco · Mining tenders

P6 schedules and technical-commercial proposal

Primavera P6 schedules for competitive tender processes and contribution to the technical and commercial proposal submitted to Antamina and other mining operations.

Primavera P6TendersTechnical proposalCost
Under confidentiality
Profile

Real control, not pretty slides

I work between the field, contractors and management. That is why the schedule reflects what is actually happening on site, and the report that reaches the board holds up when somebody asks where the number came from.

End-to-end planning and control: schedule, cost, progress, constraints and productivity.
Budgets and bids: quantities, costs and a bid schedule backed by technical substantiation.
Decision-oriented dashboards: early warnings, gaps and forecast, not just history.
Data governance: a single source of truth, version control and follow-up routines.
Contractual focus: substantiation, milestones, evidence and clarity for formal correspondence.
8+Years in project controls
7Mining operations
+90%PPC sustained
3Mining projects in portfolio

Tools

Primavera P6Power BI · DAX ExcelSQL MS ProjectPython TableauSAP B1

Methodologies

EVM · SPI/CPINEC 3 (A and B) AACEDCMA Last PlannerPMI
Career

Where I have exercised control

From field supervision to corporate project controls, always with the schedule and the data as the central tool.

Budget, Bidding and Project Controls Engineer

SEP 2026 – PRESENT
PEVOEX Contratistas · Corporate
  • Budgeting and bidding for the company's mining projects.
  • Corporate project controls: schedule, cost and progress tracking across all of PEVOEX's mining operations.
  • Primavera P6 schedules, EVM and executive reports for senior management.

Head of Data Management

MAR 2026 – AUG 2026
Jebi · Artificial intelligence for mining
  • Led three teams of 45 people across India and Peru, covering staffing, work standards, quality control and productivity metrics.
  • Data governance: a single source of truth for product, operations and customers.

Project Controls Engineer

JUL 2025 – MAR 2026
Compañía de Minas Buenaventura
  • Integrated control of scope, cost, schedule and quality, with the baseline as the single reference for measurement.
  • Primavera P6 schedules integrating physical progress and cost; monthly cut-off, variance analysis and re-planning.
  • KPIs, predictive models and dynamic Power BI reports for acceleration and resource decisions.

Planning and Project Controls Engineer

OCT 2023 – JUN 2025
Besalco-Stracon Consortium
  • Ran the planning and controls system under NEC 3 contracts (Options A and B): accepted programme, revisions and substantiation of compensation events.
  • EVM (SPI, CPI), four-week Look Ahead and PPC sustained above 90%.
  • Forensic schedule analysis under AACE practices (IAP, TIA, APAB, CPA).
  • P6 schedules for tenders and the technical-commercial proposal for Antamina and other mines.

Planning and Project Controls Engineer

APR 2023 – SEP 2023
Pevoex Contratistas · Minsur, San Rafael Mine
  • Earthworks, civil works and mine portal closure.
  • S-curves, manpower, SPI/CPI and resource control.
  • Last Planner: Three Week Look Ahead and weekly PPC.

Planning and Project Controls Engineer

SEP 2022 – DEC 2022
CIEMS SQB · Boroo Mining
  • Budgets, cost estimating and progress control against the works schedule.
  • Constraints and mitigation alternatives for schedule impact.

Planning and Project Controls Engineer

JUN 2022 – AUG 2022
Open World Mining · Volcan, Ticlio Mine

Project Consultant and IT Coordinator

FEB 2021 – OCT 2021
Expertia Capital Group

Project Controls Supervisor

SEP 2018 – JAN 2021
Open World Mining · Chinalco Peru
  • Progress and production control in drilling and earthmoving projects.
  • Weekly production indicators presented in Power BI to management.
Education

Project management and technology

Two engineering degrees plus two master's degrees: the combination that allows me to understand the mining operation and, at the same time, build the data layer that controls it.

Master in Project Management
ESAN Graduate School of Business
Graduate · PMI
M.Sc. in Educational Informatics and Information Technology
Universidad Católica de Trujillo
Graduate · Data
B.Sc. Industrial Engineering
Universidad Privada del Norte
Licensed · CIP 258814
B.Sc. Mining Engineering
Universidad Privada del Norte
Undergraduate · Mining
Services

What I can solve on your project

I support the project from the bid to close-out: budget, schedule, control and contractual substantiation. Full project or one-off engagement, remotely for any country and on site when the scope justifies it.

Planning and progress schedules

  • Baseline in Primavera P6 or MS Project: WBS, logic, resources and critical path.
  • Periodic updates, 3 to 4 week Look Ahead, constraints and PPC with Last Planner.
  • Quality check against the DCMA 14-point assessment before it goes to the client.

Cost and progress control

  • S-curve, physical progress and earned value: SPI, CPI and estimate at completion (EAC).
  • Monthly valuations, manpower and resource control.
  • Early warnings on slippage, with the recovery plan already on the table.

Budgets and tenders

  • Quantity take-off, unit price analysis and budget in S10 or Excel.
  • Bid schedule and technical and commercial proposal for mining tenders.
  • Bid risks and contingencies before committing to price and time.

Contract management and claims

  • NEC 3 contracts (Options A and B): accepted programme, early warnings and compensation events.
  • Delay and impact analysis under AACE practices (TIA, windows, as-planned vs. as-built).
  • Technical substantiation for extensions of time and formal correspondence.

Power BI dashboards and reporting

  • KPIs for progress, productivity, cost, constraints and commitments.
  • Data models and DAX connected to P6 and Excel, so nobody rebuilds the report by hand each week.
  • Weekly and monthly reports ready for the board and management.

Data governance and teams

  • A single source of truth for progress, cost and resources across site, technical office and management.
  • Field capture standards, quality control and lineage for the data behind every valuation.
  • Leadership of distributed teams with productivity and quality metrics.
Contact

Shall we talk?

Tell me the context (project, need, objective) and I will come back with the best route and, where it applies, a proposal by scope.

+51 978 750 498 Trujillo, Peru · GMT-5 jhoncampos.com